Case Study
Food Processing — Custom Systems

Case Study:
Two-Story Custom Lauter Tun System
for Scaled Protein Isolation

How MRX designed and built two prototype custom lauter tun systems in 24 weeks to support a national food corporation's protein isolation initiative — custom engineering, rapid delivery, and a two-story architecture built around the way the process actually needs to work.

National

Food Corporation

Confidential customer — anonymized

24 Weeks

Prototype Delivery

First two systems designed & built

Two-Story

Custom Architecture

Purpose-built for the process logic

Phase 1

Testing Complete

Additional testing expected soon

The Challenge

A New Product-Stream Opportunity Requires Equipment That Does Not Yet Exist

A national food corporation needed a custom process system to support protein isolation at scale as part of a new product-stream initiative. This was not a standard equipment purchase. No catalog item existed for the application. The project required a purpose-built system — one that could support a specialized process objective, scale beyond concept, and move quickly enough to be commercially useful.

MRX was engaged to design and build that system: a custom two-story lauter tun, engineered from the ground up around the customer's process goal. The result was two working prototype systems, delivered in 24 weeks, supporting Phase 1 testing that went well.

Novel process objective

Protein isolation at scale — not a standard application with an off-the-shelf solution.

Two-story system architecture

Vertical layout designed around the operational logic of the separation process.

Aggressive development timeline

The customer needed prototypes fast enough to advance a real product-development schedule.

Custom engineering from first principles

No existing template — vessel geometry, internals, and layout designed for this application.

Prototype-grade execution

Equipment built to produce meaningful test results — not just to demonstrate a concept on paper.

Ongoing development support

Phase 1 testing complete; system designed to support further evaluation as the process develops.

Key Takeaway

When a new product-stream opportunity requires a process system that does not exist in any catalog, the right manufacturing partner does not just fabricate — it engineers. The project starts with understanding the process objective and works backward to a manufacturable system that can actually do the job.

Project Context

A National Food Corporation Pursuing a New Ingredient Opportunity

The customer was a national food corporation pursuing a new product-stream opportunity built around protein isolation at scale. The technical challenge was real: they needed a process system capable of supporting a specialized separation objective — one that did not have a ready-made equipment solution.

The requirement was not limited to a vessel alone. The project demanded a more complete system mindset: process objective alignment, scale-up thinking, practical two-story layout, fabrication speed, prototype execution quality, and design discipline enough to support meaningful testing and further iteration.

Engagement Profile

CustomerNational food corporation (confidential)
System typeCustom two-story lauter tun
ApplicationScaled protein isolation
ScopeFirst two prototype systems
Delivery24 weeks — design through fabrication
StatusPhase 1 testing complete; further testing expected

The Engineering Problem

Engineering a Custom System Around a Novel Process Objective

The challenge was not simply building a large piece of food-process equipment. It was creating a custom system around a novel process objective — one where the equipment needed to be engineered from first principles rather than adapted from an existing design.

This is where the project became much more than a fabrication job. It became an engineered food-process-development challenge — requiring the design to account for the specialized separation objective, the physical layout implications of a two-story configuration, manufacturability at the required speed, and the quality standard needed to produce prototype systems that could support real process evaluation.

The project needed to account for:

A specialized liquid-solid separation objective not served by catalog equipment
Scale-up from concept toward a commercially relevant process
A two-story system layout — driven by the operational logic of the separation process
Manufacturability and fabrication speed — 24 weeks from design to delivered prototype
Prototype-grade execution — equipment suitable for real process testing, not concept review
Design discipline supporting future iteration as the process continues to develop
Coordination between engineering intent and fabrication execution in a single location

MRX Approach

Custom-Engineered Scale-Up System — Not a Standard Vessel Build

MRX approached the project as a custom-engineered scale-up system rather than a standard vessel build. The focus was on creating a practical, manufacturable lauter tun system around the customer's process goal — while maintaining enough design discipline to produce prototypes capable of supporting real process evaluation.

Engineering and fabrication managed in-house in Canby, Oregon — so the decisions that shaped the system's geometry, layout, and operational logic translated directly into what was built, without the coordination gaps that occur when design and fabrication are separated across different teams or facilities.

Key priorities in MRX's approach:

Align equipment design with the protein isolation objective — from geometry through internal layout
Build a practical two-story system architecture that serves the process operational logic
Move quickly enough to support the customer's product-development timeline
Maintain strong coordination between engineering decisions and fabrication execution
Deliver prototypes suitable for real process testing — not just concept demonstration
Preserve design clarity so the system can support iteration as the process develops further

What Was Delivered

Two Custom Prototype Systems — Designed and Built in 24 Weeks

MRX designed and built the first two prototype systems in 24 weeks. The delivered solution centered on a custom two-story lauter tun system intended to support scaled protein isolation as part of the customer's broader product-development effort.

Custom Two-Story Lauter Tun System

Two-story configuration engineered around the separation process — not adapted from a single-level standard design.

Scaled Protein Isolation Platform

System designed to support protein isolation at a scale relevant to a real product-stream development path.

Application-Specific Internal Layout

Vessel geometry, false-bottom design, and liquid management arranged around the customer's separation objective.

24-Week Design-Build Delivery

Both prototype systems — from engineering through fabrication — in 24 weeks to support the customer's timeline.

Prototype-Grade Execution

Systems built to support real process testing rather than conceptual review — producing results that can inform further development.

Phase 1 Testing Support

Delivered systems went through Phase 1 testing with encouraging results; designed to support additional evaluation.

Testing Status

Phase 1 Testing Complete — Additional Testing Expected

Phase 1: Complete

Phase 1 testing of the delivered prototype systems went well. The early testing milestone provided encouraging evidence that the system was capable of supporting the intended development path — that the custom architecture and process logic worked as designed in real operating conditions.

Further Testing: Expected

Additional testing is expected as the customer continues evaluating and refining the process opportunity. This is consistent with how serious product-development programs advance: Phase 1 confirms the system works; subsequent phases build toward commercial process confidence. The systems are designed to support that continued evaluation.

Note: This case study reflects the status of an active development program. It does not claim commercial production outcomes, full-scale validation, or regulatory approval. Testing language is intentionally conservative and reflects what is known at the time of publication.

Why the Solution Worked

Custom Architecture, Rapid Execution, Real Test Results

The value of the project was not only in delivering custom equipment quickly. It was in delivering a system that aligned with the process objective strongly enough to support real development progress — systems that could go into Phase 1 testing and produce results that mattered.

Custom food-process prototypes fail to generate useful development data for a predictable set of reasons: the geometry does not reflect the intended production design; the internal layout constrains the process rather than enabling it; the fabrication quality is insufficient to maintain process integrity during testing; or the delivery takes so long that the development program stalls. The MRX approach to this project addressed each of those failure modes directly.

Custom architecture built around the application

The two-story lauter tun was designed for this separation objective — not adapted from a beverage-industry standard. That alignment between system design and process goal is what makes prototype test results meaningful.

Two-story configuration chosen for process logic

The vertical layout was not arbitrary — it served the operational logic of the separation process, allowing gravity-assisted liquid management and a physical footprint that matched the facility and process requirements.

24-week delivery supported a real development schedule

A prototype that arrives too late does not support a development program — it interrupts one. Delivering in 24 weeks kept the customer's product-development timeline moving forward.

Prototype-grade execution — not a concept model

The systems were built to the standard required for real process evaluation. That distinction — between a concept model and a prototype capable of producing actionable test data — is where the development value is created.

Engineering and fabrication coordinated in-house

Design decisions made in Canby, Oregon, translated directly into the fabricated systems — without the geometric drift, schedule fragmentation, or communication gaps that arise when design and build are separated.

Phase 1 results supported further development confidence

When Phase 1 testing goes well, it means the system worked well enough to generate useful data and advance the process development path. That is the outcome a well-engineered prototype is designed to produce.

Why This Case Study Matters

New Product-Stream Opportunities Need Equipment That Doesn't Exist Yet

For other food and ingredient manufacturers, this project highlights an important reality: new product-stream opportunities often require custom process systems that do not exist in any standard equipment catalog. The more novel the process objective, the more valuable it is to work with a manufacturing partner that can understand the process goal, engineer around a specialized application, and move quickly into prototype execution.

That is not a universal capability. Most equipment suppliers can fabricate to a drawing. Fewer can start from a process objective and work backward to a manufacturable, testable prototype system in a commercially viable timeline.

What matters most for custom food-process development:

Process objective clarity — defining what the system must actually do before geometry decisions are made
Application-specific design — equipment built for the process, not the closest standard catalog option
Prototype quality — systems capable of producing test results that meaningfully inform development
Fabrication speed — delivery timelines that support rather than interrupt development programs
Iteration readiness — design discipline that supports refinement when testing informs it
Engineering and fabrication alignment — so design intent translates into what is built

How MRX Approaches Custom Food Process Systems

MRX approaches custom food-process projects as application-driven engineering and fabrication challenges. We support projects where process innovation, custom equipment design, speed to prototype, and practical manufacturing execution all matter.

Our role is not just to build stainless equipment. It is to help define and build the right system for the way the process actually needs to work — in-house in Canby, Oregon, from engineering through fabrication and delivery.

What MRX brings to a custom food-process development project:

Application-driven engineering — starting from the process objective, not a catalog template
Custom system design — geometry, layout, and internals built for the specific application
Rapid prototype delivery — fabrication speed that supports real development timelines
In-house coordination — engineering and fabrication managed together in Canby, Oregon
Prototype-grade execution — systems capable of producing actionable test results
Iteration support — design discipline that supports refinement as the program develops

Frequently Asked Questions

Custom Lauter Tun Systems & Food-Process Scale-Up

Oregon Engineered — Canby, OR

Need Help Building a Custom
Food Process System?

Talk with MRX about your process objective, product-development goals, scale-up needs, fabrication timeline, and system requirements. We can help define the right custom-engineered approach from design through delivery.