Free Planning Tool
Facility Readiness Planner
Five targeted sections. A traffic-light readiness report across space, utilities, shipping, and commissioning — before your MRX project begins.
Designed by MRX commissioning engineers based on real installation experience across 9 industries. Takes approximately 3–4 minutes. No login required.
500+
Systems Installed
11+
Years in Service
9
Industries Served

Pre-Installation Engineering Assessment
MRX Manufacturing — Canby, Oregon. Certified to ASME BPVC 2026 and UL 508A.
Step 1 of 5
Equipment
Equipment & Application
Select the type of system you are planning to install and its approximate scale. This determines the baseline space, utility, and structural requirements for everything that follows.
What type of system are you planning to install?
Approximate system scale or capacity
Scale drives structural loading, utility ampacity, and the shipping envelope — all of which affect site readiness planning.
Answer all questions to continue

Engineering Note
MRX right-sizes equipment from pilot-scale lab systems to 10,000+ gallon industrial vessels. Aligning on system type and scale in the first conversation prevents costly late-stage specification changes and protects your lead time.
Questions about your facility requirements? MRX engineers are available to walk through your site.